Land O’ Lakes Whey Building Bulk Bag Filler Addition
Kiel, WIArchitect/Engineer
McMahon & AssociatesOverview
August Winter installed two new semi-custom roof top units to condition the space of the new bulk bag filler system. The customer required HVAC equipment to perform to stringent temperature tolerances and pressures in production spaces. All the ductwork in the process area was required to be stainless steel welded ductwork. This project came in within budget and was finished ahead of schedule.
—