St. Norbert College
Green Bay, WIArchitect/Engineer
PerformaOverview
August Winter installed large diameter concrete piping and manholes to be used as a tunnel system to connect steam and condensate piping to the existing dorm buildings. The project required some deep excavation and digging around many underground utilities.
—